01Our portfolio
Work that is on record.
We let documents speak: every project here is backed by the client’s own written assessment, start-up parameters and photos from our shop.
- gas turbine engines overhauled for JSC Uztransgaz
- 3
- gas turbine engines overhauled for JSC Uztransgaz
- units commissioned into service after start-up
- 3
- units commissioned into service after start-up
- monitored parameter groups within required limits
- 4
- monitored parameter groups within required limits
- stages of our full-cycle repair
- 7
- stages of our full-cycle repair
02Featured project
Major overhaul for JSC Uztransgaz.
- Country
- Uzbekistan
- Units
- NK-12ST · NK-14ST · NK-16ST
- Scope
- Major overhaul, start-up and commissioning
- Result
- Commissioned into service
- Document
- Letter №01-36/1-222-1436 · 21.11.2025
Parameters verified at start-up
- Temperature
- Vibration
- Rotation speed
- Stability at operating modes
- 01
Task
A complex of works related to the major overhaul of NK-12ST, NK-14ST and NK-16ST gas turbine engines operated by the national gas transmission company of Uzbekistan.
- 02
Execution
Work ran within the agreed timeframe in compliance with technical documentation, industrial safety requirements and applicable quality control standards. Technical issues that arose during repair were resolved by Pilatus FZCO specialists promptly and professionally.
- 03
Result
Following start-up and commissioning, all three engines were successfully put into service. Monitored parameters — temperatures, vibration, rotation speed and stability at operating modes — met the established requirements.
The client specifically noted
- Technical competence of the specialists involved
- Responsible approach to meeting obligations
- Quality of support throughout the work
- Readiness to make well-grounded engineering decisions

03From the shop floor
Inside our repair shop.
Real photos from the overhaul shop: teardown, crane handling, inspection and build-up of turbine modules.








04Fleet experience
Models in our portfolio.
Aero-derivative industrial gas turbines we overhaul and maintain.

NK-12ST
≈ 12 MW · gas compressor stations
Uztransgaz project
NK-14ST
≈ 16 MW · gas pumping, mechanical drive
Uztransgaz project
NK-16ST
≈ 16 MW · gas-pumping units
Uztransgaz project
AI-336-2-8
≈ 8 MW · mid-range power

DG-90L2
UGT15000 · three-shaft
05Next step
Tell us about your turbine.
Share the model, operating hours and condition of the unit. We will propose the scope and timeline.
- 01
Request
Model, hours, symptoms.
- 02
Assessment
Condition and scope review.
- 03
Proposal
Estimate, timing and schedule.
- Phone
- +971 56 274 53 20
- sales@pilatusfzco.com
- Website
- pilatusfzco.com
- Centres
- UAE · Kazakhstan · Uzbekistan
Repair and maintenance of NK-12ST, NK-14ST, NK-16ST, AI-336-2-8 and DG-90L2 industrial gas turbines.
Write to us